Suncor E1 Well Kill

Avara provided project management and engineering support for the Suncor E1 Well Kill.  This was a rigless intervention using the Terra Nova FPSO as the platform for pumping a cross-linked polymer based fluid 7 km through the water injection system to seal the perforated interval of F-88 2 (E1).